Discussion:
Background
The Parks, Trails and Recreation Master Plan recommended that the trail system along the Upper Valley Drainageway would be rebranded as the Vierling Greenway, complete with new signage identifying routes, adding amenities and adding a trailhead in Lion's Park, near Fire Station 2. Staff working with consultants from Confluence Design have developed two signage packages that could be used for this project as well as a larger effort to brand other trail loops throughout the city.
Concepts
The two concepts include a variety of types of signs to be used throughout the trail system as well as options for park signs, which would be replaced as parks are refreshed. Signs have been designed for trailheads, with both a vertical and horizontal style, along with directional signs that would include maps and indicate landmarks or additional amenities. Trail markers would also indicate to a user that they are on the right trail path - these are especially important where gaps in the trail network exist and mileage markers to note distance traveled or distance to other destinations along the trail system. A map of the Vierling Greenway route, and where each signage type could be located has been included.
The first proposed design is a modern design which leans heavily on the City of Shakopee branding. The materials used in this design are concrete and metals. The second design is a more traditional design that is made of composite wood and metals.
Gateway Signage
In addition to the signage and wayfinding concepts, staff has provided a concept of a gateway sign which would be installed along Highway 101. This signage was included as one of the "Big Ideas" in the 2040 comprehensive plan as part of the vision to beautify Highway 101 and create a better first impression for visitors and guests.
The proposed sign is similar to the sign that proposed in the 2040 Comprehensive Plan, and has a Kasota stone base, with a limestone cap, an aluminum cabinet, aluminum letters and LED lighting. Staff is seeking input on the design and potential location(s). The estimated cost is $48,000 per sign and these are not included in the current CIP.
Next Steps
Tonight, staff would like the City Council's feedback on the two signage concepts. Following this, staff will make any changes, finalize the design and bring the final design back to City Council in late January. Staff anticipates construction to begin in 2021.