Preliminary and Final Plat of Hentges Industrial Park
Policy/Action Requested:
Approve Resolution No. R2021-041, a resolution approving the Preliminary and Final Plat of Hentges Industrial Park, and move its adoption.
Recommendation:

The Planning Commission reviewed the Preliminary Plat on March 4, 2021, and by a 7-0 vote, recommended approval of the plat.

Discussion:

Cretex Industrial Park, LLC has submitted an application for Preliminary and Final Plat approval of Hentges Industrial Park, which consists of property in Cretex Industrial Park 1st Addition and Howe 1st Addition located east of 70th Street and south & west of Stagecoach Road.

Cretex Industrial Park, LLC is proposing a redevelopment of this heavy industry zoned property that requires a new plat submittal.

The site consists of approx. 80 acres, and once platted, would provide 5 lots, a new Hentges Way public right-of-way, and a reconstructed Stagecoach Road with an extensive roundabout. Lot 1, Block 1 would be a 39-acre site for a 500,000 square foot industrial building (Southwest Logistics Center), and Lot 1, Block 2 would be a reconfigured lot for Gavilon Fertilizer, LLC/microSource, with the remaining lots available for industrial development opportunities. Additionally, there will be a new section of 70th Street public right-of-way/public street.

There has been significant review of this project, including submittal and approval of an EAW (Environmental Assessment Worksheet) in February, 2021. This plat project initially started last summer, and was further reviewed by the Commission last December (Public Hearing was continued to March 4, 2021). The concept before the Commission now is quite a bit different than previous iterations, and all parties involved feel this is a development that meets their approval. A site has been created that meets the criteria for the Southwest Logistics Center, Gavilon Fertilizer, LLC has provided additional land to allow for the new Stagecoach Road roundabout to meet all agencies requirements; and in trade they are provided land in exchange that can be utilized in their future expansion opportunities, and there is a new public road and Outlots that comply with City Code design standards.

City departments, Scott County and other outside agencies were given the opportunity to review and provide comments regarding this application. City Engineering, Shakopee Fire, MVTA and SPUC support the request, provided the proposed plat complies with the conditions noted in the draft resolution for the City Council’s consideration.

 

Two late minor items pertain to the desired drainage & utility easement along the east property line of Lot 1, Block 2 (Gavilon Fertilizer, LLC property) being reduced from 10 feet to 5 feet, which is acceptable to all parties involved; and working thru design details with Magellan Pipeline’s easement to ensure compliance with their standards. Those items will be addressed prior to recording (draft condition E), should the Council approve this Plat.


Budget Impact:
N/A
ATTACHMENTS:
Description
Resolution No. R2021-041
Exhibit A - Legal Description
Site Aerial
Preliminary Plat of Hentges Industrial Park
Final Plat of Hentges Industrial Park
Stagecoach & Hentges Way Layout
Southwest Logistics Center Site
Engineering Memo
SPUC Memo