Item Coversheet

*4.B.3.


Shakopee City Council
March 7, 2023


FROM:Micah Heckman, Assistant City Engineer
TO:Mayor and Council Members
Subject:
Approve Plans and Authorize Bidding for the 2023 Full Depth Pavement Reconstruction and Bituminous Pavement Rehabilitation Projects
Policy/Action Requested:
Adopt Resolution R2023-030, approving plans and specifications and ordering advertisement for bids for the 2023 Full Depth Pavement Reconstruction & Bituminous Pavement Rehabilitation Projects CIF-23-001, CIF-23-011, CIF-23-012, and CIF-23-013. 
Recommendation:
Adopt Resolution R2023-030 as requested.
Discussion:

The City's Capital Improvement Plan (CIP) contains the following CIP projects (see attached CIP summary sheets):

 

  • 2023 Full Depth Pavement Reconstruction Project CIF-23-001, which consists of full depth pavement reclamation, constructing ADA compliant pedestrian curb ramps, replacing broken concrete sidewalk, curb and gutter and driveway aprons and paving a new bituminous pavement section on various streets throughout the city. 
  • Annual Pavement Rehabilitation Project CIF-23-011, which consists of joint and crack repair, patching and a chip seal coat of the streets in the Westchester neighborhood and 4th Avenue from Naumkaeg Street to Marschall Road.
  • Annual Bituminous Overlay Project CIF-23-012, which consists of joint and crack repair, patching, milling, constructing ADA compliant pedestrian curb ramps and paving a bituminous overlay of various streets throughout the city.
  • Annual Trail Rehabilitation Project CIF-23-013, which consists of reclaiming and reconstructing the bituminous trail surface, and constructing ADA compliant pedestrian curb ramps for trails along Fuller Street from 10th Avenue to Vierling Drive. 

 

These projects are a continuation of the City's Pavement Preservation Program to maintain existing infrastructure. These projects are proposed to be combined for bidding and construction due to the similar nature of the proposed improvements, to realize economies of scale and to save staff time in coordination.

 

The size, scope and costs associated with the projects generally remain the same as identified in the CIP plan. However, the Providence Pointe neighborhood rehabilitation project was completed in 2022. In addition, the L-16 lift station parking lot mill and overlay and construction of trails or pedestrian ramps in several areas were added to the project to capitalize on the economies of scale.

 

Project Procurement

Plans have been prepared for all of the combined projects and are ready to solicit public bids to construct the improvements. Upon approval, the advertising and bidding will commence with a scheduled bid opening of spring 2023. Bids would then be considered and awarded with construction of the improvements scheduled for summer 2023.

Budget Impact:

Table 1 below provides the CIP budgets for each project. The estimated total cost for each project is within its respective CIP budget. The overall CIP budget for all four projects is $6,026,000.

 

Table 1. CIP Project Budgets

CIP Project No.

CIP Project Name

CIP Budget

Estimate

CIF-23-001

2023 Full Depth Pavement Reconstruction

$         2,636,000*

CIF-23-011

Annual Pavement Rehabilitation

$            200,000

CIF-23-012

Annual Bituminous Mill and Overlay

$         3,000,000

CIF-22-013

Annual Trail Rehabilitation

$            190,000

Total    $         6,026,000

 

*Amended Feasibility Budget


ATTACHMENTS:
Description
Resolution R2023-030
Project Plans Cover Sheet
CIP Sheets