Subject:
Award of Contracts for Fire Station Remodel
Policy/Action Requested:
Approval as requested. 
Recommendation:
Approve awards for contracts for the remodel of Fire Station 1. 
Discussion:

On March 6, 2024, City Council approved the advertisement for bids in order to remodel Fire Station 1. When the department transitioned to a 24/7 staffing model in 2020 temporary sleeping quarters were put in place and are still in use today. While those temporary accommodations have served our department well, a more permanent solution is needed for the health, welfare, and comfort of our staff. This project would relocate and remodel existing training space to make way for four dorm rooms, which includes substantial mechanical and electrical work; remodels the existing office space to allow for better utilization of work areas; provides outdoor signage for the facility (currently there is none); and refinishes the apparatus bay concrete floor in order to significantly extend its useful life. 

 

Terra Construction prepared and advertised bid documents for the project, and opened bids on April 9, 2024. A total of 52 bids were received for the various categories. The low bidders are as follows:

 

Description Low Bid Low Bidder
QC1A Final Clean $1,400.00 Nordic Shine
QC2A Selective Demo $22,790.00 Lloyd's Construction
QC6E Casework $37,045.00 Ron's Cabinets
QC8A Doors & Hardware $28,345.00 WHC
QC8C Glass & Glazing $21,649.00 Minneapolis Glass
QC9A Gypsum Board $46,000.00 FEI
 QC9C ACT $11,407.00 Acoustical Concepts
QC9E Flooring $23,557.95 Marlow
 QC9H Fluid Applied Floor $62,000.00 QC Companies
QC9J Painting $23,400.00 Rainmaker
QC10B Signage $18,398.94 Fourth Dimension
QC21A Fire Suppression $14,400.00 Dynamic
BC22B Plumbing & Mechanical $64,900.00 Falcon
BC26A Electrical $103,268.00

Medina Electric

 

In addition to the specific project costs above there are associated construction manager costs (contract with Terra Construction approved 3/6/24), with a current total of hard costs at $573,653.70, as well as a soft cost allowance (design fees, furniture and fixtures, testing & inspections, continency) at a current total of $155,500, for a total project cost of $729,153,70. The original project estimate was $800,000. 

Budget Impact:
The total project cost is $729,153.70, which is less than the originally budgeted estimate of $800,000. This project will be funded from the Public Safety Aid dollars allocated by the state in the 2023 Legislative Session. 
ATTACHMENTS:
Description
Terra Recommendation
Low Bid Summary
CIP Sheet