Discussion:
The last major improvement for the Quarry Park Master Plan is the installation of a covered picnic shelter in the north west corner of the park.
This shelter will have a concrete slab under the shelter.
Only items remaining to be purchased next year after installation are picnic tables, garbage cans and a grilling station.
$88,000 30 x 44 REK Shelter. Stained T&G wood deck with Multi Rib metal roof.
Engineering drawings, shipping, etc. included.
$35,000 Shelter Installation Only
$22,276 Concrete Slab – Approximately 1632 Sq. Feet – 34’ x 48’
$10,530 (6) Footings with Rebar Cages, Sona Tubes
$10,000 Excavation, Site Prep, Base, etc
$165,806 plus contingency